Allion Compliance Update

Bluetooth|May.

● Test Case Reference List (TCRL) Release

PCI Express|May.

● PCI-SIG Compliance Workshop #135

  • July 28, 2025 – August 1, 2025 Embassy Suites San Francisco Airport South San South Francisco, CATBD

● PCI-SIG Developers Conference Korea

  • September 22, 2025 Sofitem Ambassador Seoul Hotel ​Seoul, South Korea

● PCI Express Base Specification Revision 7.0 Version 0.9

  • Review period closes on Monday, May 19, 2025

Thunderbolt|May.

● Intel certification subsidy of Thunderbolt 5 device will extend to the end of 2025.

USB|May.

USB

● Basic signal quality testing for Full Speed (FS) and Low Speed (LS) devices no longer needs to be performed behind five tiers of hubs.

● Low Speed:

Low-speed devices must have a captive cable, so no specific cable requirement applies they should be tested as-is.

● Full Speed Cable Requirements:

  • Standard-B: 5 meters
  • Mini-B: 4.5 meters
  • Micro-B: 2 meters
  • USB-C: 4 meters

USB Type-C/ Power Delivery

● Reference of USB Power Delivery Specification Release Datesspec update_Allion Labs

Wi-Fi|May.

● Extending the effective date of some ECNs from Dec 2026 to Dec 2027

  • ECNs remaining December 2026:

    • Wi‑Fi CERTIFIED 6 (partial) ECN_#00617 Wi-Fi CERTIFIED 6.pdf
      • Note – only changes associated with the to 6 GHz Spectrum Capabilities for the 6 GHz device class capabilities will remain effective December 2026, all other changes are extended to December 2027
This entry was posted in . Bookmark the permalink.